Telecom system integrator

TELECOM SYSTEM INTEGRATION
PIPELINE GK1-GK2

Status: Completed

Client: SONATRACH TRC


Scope of Work: Design, Engineering, Procurement, Construction, Commissioning and Start-up.

Main Features:

Integration of OTN (Open Transport Network) system along GK1/GK2 pipelines from Hassi R’mel to Skikda (570 Km.)

Laying of fibre optical cable 24 brins

Refurbishment of 60 telecommunication station

Installation of 41 solar panels with batteries


Location: Hassi R’mel – Skikda, Algeria

Date of award: October 2014

Duration: October 2016