Baraka Field Development Project

Status: Completed

Scope of Work

Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up.

Project Description

​​​Realization of a Wellhead platform with production facilities for 2+1 wells.

Technical Details

Main feature Topside22x22x7 (LxWxH)
weight570 tons
Wellhead module  70 tons
Jacket 3-legs100 m (H), 1.200 tons (W)
Piles770 tons (W)