BASELOAD POWER HUB
(H2 PRODUCTION, H2 BATTERY STORAGE, POWER MANAGEMENT SYSTEM FOR WIND FARMS, RENEWABLE POWER GENERATION ENHANCEMENT)
Status: In progress
Client: CrossWind – joint venture between Shell (80%) and Eneco (20%)
Scope of Work:
Detailed design, procurement of material and equipment, construction work, transport and installation at sea, commissioning and start-up of the platform.
Technical Data
Technologies to be deployed:
- 1 MWe/5 MWhe lithium-ion BESS
- 2.5 MW electrolyser
- 1,200 kg of 30-40 barg H2 gas storage
- 1.0 MWe fuel cell
- Power Management System
- HV Switchgear 66kV
- Transformers 66/6.6 kV/ 480V
- Control System, F&G
- Water Treatment Plant
Location: Hollandse Kust Noord offshore windfarm, 18.5 kilometres off the Dutch coast.
Fabrication site: Piomboni yard, Marina di Ravenna (ITALY)
Date of award: July 2023
Completion date: November 2025