Significant Projects
>>
Sannazzaro East Project
Owner:ENI R&M
Owner Representative:SAIPEM
Location: ITALY – Sannazzaro de’ Burgondi
Main Contractor:ROSETTI MARINO SpA
Date of Contract Award: 11/09/2009
Delivery: october 2010
Scope of Work: Supply of 3 big colums.
Vacuum Column is expected to be assembled directly on the foundation, in vertical position
No. 1 Preflash Column Item No. E-90104
L=38700-diam.2500-5000
Capacity 240 cu.m.
Des.Pres. 6/FV – Des.Temp. 400 C°
Material SA 516-60 + A240TP304L
Thick. Mm. 12+3 – Weight kg. 75400
Design Code PED97/23/CE ISPESL-VRS/M/S
No. 1 Vacuum Column Item No. E-90105
L=54800-diam.5500
Capacity 1112 cu.m.
Des.Pres. 6/FV – Des.Temp. 395 C°
Material SA 516-60 + A240TP410L
Thick. Mm. 24+3 – Weight kg. 256200
Design Code PED97/23/CE ISPESL-VRS/M/S
No. 1 Atmospheric Column Item No. E-90106
L=33500-diam.31000
Capacity 239 cu.m.
Des.Pres. 6/VF – Des.Temp. 430 C°
Material SA 516-60 + A240TP304L
Thick. Mm. 18+3 – Weight kg. 86200
Design Code PED97/23/CE ISPESL-VRS/M/S