Gassi Touil Gas Processing Facilities Project


Owner: SONATRACH
Client: JGC Corp.
Location: Algeria – Gassi Touil
Supplier: ROSETTI MARINO SpA
Date of Contract Award: 31/03/2010
Latest Delivery Milestone: April 2011
Scope of Work: supply of No.2 slug catcher delivered in sub-assembled parties: finger pipes, boots, boots headers, headers and manifolds. The SoW also includes internal coating and assembly supervision at Site.
No. 1 HP Slug Catcher (finger type) Item No. G01-VL-20-201
L=72000-Ø52"
Layout 80mx30m (no. 8 fingers)
Capacity 640 cu.m.
Des.Pres. 79,5 barg – Des.Temp. -20/+80 C°
Material API5L X65
Thick. 40mm – Weight 1180000 kg
Design Code ASME B31.3
No. 1 LP Slug Catcher (finger type) Item No. G01-VL-20-101
L=48000-Ø52"
Layout 50mx20m (no. 6 fingers)
Capacity 280 cu.m.
Des.Pres. 35 barg – Des.Temp. -20/+80 C°
Material API5L X65
Thick. 23mm – Weight 549000 kg
Design Code ASME B31.3