Significant Projects pre - 2000

ASGARD b SEPARATION MODULES

Client: STATOIL
Location: Smorbukk Field, Norway
Main Contractor: J.V. SaiROS (three Companies of Saipem Group + Rosetti Marino SpA)


Date of Contract Award: August 1997

Delivery Date: May 1999

Main Activities:
Design, engineering, procurement, construction, onshore precommissioning, loadout and sea fastening Description: Separation (M15-M16) and M20 Stabilisation Modules (*)

Weight:
M15 Module 1,300 tons
M16 Module 1,100 tons
M20 Module 900 tons

(*) The M20 Stabilisation Module was fabricated by another partner of SaiROS at a different location.

KITINA PLATFORM

Client: AGIP RECHERCHES CONGO
Location: Kitina Field, Congo
Main Contractor: SAIPEM SpA
Fabrication Subcontractor: RosBos (J.V. between Bouygues Offshore and Rosetti Marino SpA)


Description:
EPC contract for integrated deck and flare

Weight:
Deck 5,000 tons
Flare 150 tons

Date of Contract Award: March 1996

Delivery Date: September 1997

Main Activities:
Execution of shop drawings, procurement of structural material, piping, electrical, instrumental and outfitting, fabrication, tests, load-out, seafastening, transport to site.

Manhours: 400,000

M3 & M4 MODULES FOR NKP PROD. PLATFORM

Client: ELF CONGO
Location: N’Kossa Field Congo
Main Contractor: J.V. Bouygues Offshore-RosBos Scrl (1)

(1) J.V. between Bouygues Offshore and Rosetti Marino SpA

Description:
M3 Power generation module and M4 Compression module for NKP floating production platform

Weight:
M4 Module 5,000 tons
M3 Module 4,200 tons

Date of Contract Award: December 1993

Delivery Date: August 1995

Main Activities:
Execution of shop drawings, procurement of structural, piping, electrical, instrumental and outfitting material, construction, testing, load-out, seafastening, transportation to site.

Manhours: 1,000,000

 