Significant Projects 2000 - 2008

BARAKA FIELD DEVELOPMENT PROJECT - BARAKA PLATFORM

Client: ENI Tunisia B.V.
Location: Offshore Tunisia
Main Contractor: ATI – Intermare Sarda-Saipem Energy Services-Rosetti Marino


Description:
Wellhead platform with production facilities for 2+1 wells.

Topside:
LxWxH: 22x22x7
Weight: 570 tons

Wellhead module:
Weight: 70 tons

Jacket:
Type: 3-legs
Height: 100 mt
Weight: 1.200 tons

Piles
Weight: 770 tons

L.O.I:
17/04/2008
Ready for Sail Away:
Jacket+Wellhead Module+Piles: February
Start up

Type of Contract:
Target price contract based on risk and reward philosophy

PIPELINE OIL & GAS TRAPS SKIDS - ENGINEERING, PROCUREMENT AND FABRICATION ACTIVITIES

Client: AGIP KCO NV
Project: Kashagan Experimental Program
Location: North Caspian Sea, Kazakhstan sector
Main Contractor: Rosetti Marino S.p.A.

Preliminary data

Weight: approx. 1,075 tons

Description:
- Nr. 9 offshore traps skids (and associated piping, instrumentation and electrical equipment and wiring)
- Nr. 3 on-shore traps

Date of Contract Award: February 2007

Type of Contract: Unit Rate

EPC CONTRACT
Detail Engineering, Procurement, Fabrication, Testing, Load-out, Sea-fastening and Certification.

THEKAH 2 AND THEKAH NORTH PLATFORMS, SUBSEA PLEM 1 AND 2 - ENGINEERING AND PROCUREMENT ACTIVITIES

Client: PETROBEL - BELAYIM PETROLEUM COMPANY (EGYPT)
Location: Offshore Egypt – Thekah Field
Main Contractor: PETROJET


Description: THEKAH 2 Platform Monopod and wellhead module
Dimensions:
Height: 33 m
Weight: 605 Tons

Description: THEKAH NORTH Platform Monopod and wellhead module
Dimensions:
Height: 39 m
Weight: 625 Tons

Description: PLEM 1
Dimensions:
Length x Width: 16.5 m x 20 m
Weight: 156 Tons

Description: PLEM 2
Dimensions:
Length x Width: 13 m x 14 m
Weight: 100 Tons

Date of Contract Award: 2nd December 2007
Ready for Sail Away: July/September 2008

Type of Contract: Lump sum

EP CONTRACT
Engineering, Procurement

MAIN SYSTEMS:
Fire & gas detection system
Emergency shutdown system
Communications
Emergency power generation
Switchboards, transformers
And lighting
Ups
Drains, sewage, sea water
Cranes and hoisting equipment

IKALOU FIELD DEVELOPMENT PROJECT - IKALOU PLATFORM

Client: ENI Congo s.a.
Location: Offshore Congo – Ikalou
Main Contractor: Consortium Rosetti Marino/Intermare Sarda/S.E.I.


Description:
Unmanned wellhead platforms with production and separation facilities for 4 wells.

Topsides Ikalou
LxWxH: 35x25x17 mt
Weight: 1.050 tons

Jacket Ikalou
Type: 3-legs
Height: 86 mt
Weight: 1290 tons

Piles Ikalou
Weight: 890 tons

Contract Award: September 2006

Ready for Sail Away:
June 2007
Start up
October 2007

Type of Contract: Alliance Risk/Reward

Rosetti Marino Scope of Work:
Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Revamping of nr.3 neighbouring platforms, Commissioning, Assistance to Start up.

IKALOU FIELD DEVELOPMENT PROJECT - IKALOU SUD PLATFORM

Client: ENI Congo s.a.
Location: Offshore Congo – Ikalou
Main Contractor: Consortium Rosetti Marino/Intermare Sarda/S.E.I.


Description:
Unmanned wellhead platforms with production and separation facilities for 4 wells.

Topsides Ikalou Sud
LxWxH: 35x25x17 mt
Weight: 1.050 tons

Jacket Ikalou Sud
Type: 3-legs
Height: 90 mt
Weight: 1320 tons

Piles Ikalou Sud
Weight: 890 tons

Contract Award: September 2006

Ready for Sail Away: June 2007

Start up: October 2007

Type of Contract: Alliance Risk/Reward

Rosetti Marino Scope of Work:
Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Revamping of nr.3 neighbouring platforms, Commissioning, Assistance to Start up.

HALFDAN NORTH EAST PHASE 3 DEVELOPMENT 2005 - HCA TOPSIDE AND JACKET

Client: MAERSK OLIE og GAS AS
Location: Offshore Denmark – Halfdan Field


Description:
Unmanned wellhead platform with separation facilities, including facilities for productions from 10 wells.

Date of Contract Award: 1° February 2006

Ready for Sail Away: June 2007

Type of Contract: Lump sum

Scope of Work:
EPC Contract
Detail Design, Engineering, Procurement, Fabrication, On-shore Commissioning, Load-out, Sea Fastening

Topside
N° of Decks: 5
LxWxH: 20x11x15 mt
Weight: 590 tons

Jacket
Type: STAR Jacket
Height: 65 mt
Weight: 1075 tons

Foundation Piles (3 off)
Type: Driven
Weight: 490 tons

VALDEMAR AB PLATFORM

Client: MAERSK OLIE og GAS AS
Location: Offshore Denmark – North Sea Basin Valdemar Field


Description:
Unmanned wellhead platform with separation facilities to be linked by a bridge to the existing Valdemar A platform, including facilities for productions from 8 wells and it shall be prepared for 10 wells.
Water Depth at installation site will be 41 mt

Overview of Weight and Dimension:
Jacket
Type: STAR Jacket
Height: 62,6 mt
Weight: 800 tons
Foundation Piles (3 off)
Type: Driven
ØxL: 1524x66,23
Weight: 450 tons

Date of Contract Award: September 2004

Date for delivery at site: June 2005

Type of Contract: Lump sum

Scope of Work:
EPC Contract
Detail Design, Engineering, Procurement, Fabrication, On-shore Commissioning, Load-out, Sea Fastening

Topside
N° of Decks: 5
LxWxH: 20x11x15 mt
Weight: 500 tons

Bridge
Length: 50 mt
Weight: 100 tons

BAHR ESSALM PROJECT - LYBIA

Operator: Agip Gas BV – Libyan Branch
Contractor: BCD Consortium Joint Venture between SAIPEM S.A. (F) Doris Engineering (F) and Cameron (UK)
Field: Western Libya Gas Project - Mediterranean Sea - 105 km offshore Libya –Water Depth 149 m


Scope of Work:
Construction engineering, procurement, fabrication, assistance to testing, loadout and seafastening of:
•2 off Pre Drilling template (PDT)
•2 sets of 4 Docking Piles with Quick Connectors
•2 off Protective Structure & Manifold (PSM)
•Main structures
•Protective Hatches
•Production Piping & Valves (Cladded and Solid Inconel)

Factory Acceptance Tests (FAT)
Site Integration Tests (SIT)

Contract Award: August 2002

Sail away: December 2003

Total Weights:
PDT: 93 tons each
Piles: 200 tons
PSM: 740 tons each
Total ~ 1900 tons

BD1 PLATFORM

Client: COMPAGNIE DES PETROLES TOTAL LIBYE
Location: 100 miles offshore Tripoli – Libya – Mediterranean Sea
Main Contractor: RosBos (J.V. between Bouygues Offshore and Rosetti Marino)


Date of Contract Award: March 2001

Delivery Date: October 2002

Main Activities:
Detail Engineering, procurement, fabrication, onshore construction, pre commissioning load-out, sea fastening.

Manhours: 420,000

KATARINA PLATFORM

Owner & Client: INAGIP
Location: Katarina Field Development, Adriatic Sea (Croatian Waters)


Description:
Jacket & conductor pipes: 1.160 tons.
Piles: 920 tons
Deck, Topsides and L.Q.: 950 tons

Date of Contract award: July 2005

Date for delivery at site: September 2006

Scope of Work: EPC Contract
Detail design, Engineering, Procurement, Fabrication, Onshore Construction, Onshore Commissioning, Load-out, Sea-fastening, Transport, Hook-up, Offshore commissioning and assistance to start-up.

Total manhours: Approx. 300,000