West Franklin Project

Status: Completed

Scope of Work

Engineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the West Franklin Platform

Project Description

​​West Franklin topside will be used in the extraction of gas and condensed crude oil, with 9 high-pressure and high-temperature wellheads, the estimated production design rate of West Franklin platform is 40,000 barrels of oil equivalent per day.

Technical Details

Main feature Topside40x40x20 (LxWxH)
Weight3.300 tons