Elgin Project

Status: Completed

Scope of Work

Engineering, Procurement, Construction, Installation, Hook-up and Commissioning of Topsides for the Elgin B platform

Project Description

​​​Elgin B topside will be used in the extraction of gas and condensed crude oil, with 12 high-pressure and high-temperature wellheads, the estimated production design rate of Elgin B platform is of 65,000 barrels of oil equivalent per day.

Technical Details

Main feature Topside35x35x15 mt (LxWxH)
Weight2.300 tons